Record

Entry TypeCorporate
Corporate NameCalow Colliery
Parent BodyStaveley Coal and Iron Company Limited
Also Known AsCalow Main Colliery
PlaceCalow
Epithetcoal mine
Dates1899-1934
HistoryThe colliery was first sunk in 1899 by the Staveley Coal and Iron Company, following the construction of a railway branch line from Chesterfield that served both Calow and Bonds Main Colliery. It is thought that some experimental older shafts sunk in the 1870s were used as ventilation shafts. In 1908, the underground workings were joined with Bonds Main Colliery. There were also 2 drift mines at the site. The pit village of Arkwright served the colliery, as well as nearby Arkwright Colliery. The colliery closed 1934 when it was decided to centralise local workings at Arkwright Colliery, where it was possible to produce bigger and better qualities of coal. The shafts and drift mines were absorbed into the Arkwright site.
Source‘Bonds Main’, https://www.oldminer.co.uk/bonds-main.html
‘Bond's Main Colliery Closed May 1949 After 52 Years’, http://www.healeyhero.co.uk/rescue/individual/Bob_Bradley/Bk-4/B4-1949-B.html
‘Calow Main’, http://www.oldminer.co.uk/calow-main.html
Griffins, A. R., Mining in the East Midlands, 1550-1947 (London: Frank Cass & Company Limited, 2005)
Wain, K., The Coal Mining Industry of Sheffield and North Derbyshire (Amberley, 2014)
Authorised Form of NameCalow Colliery; 1899-1934; coal mine

Show related Catalog records.

Add to My Items